This notice is to advise you that Cornwall Gravel Co. Ltd. will be reconstructing King Street/Front Road West (County Road 12) from John Street to Dufour Street. EVB Engineering will be representing Champlain Township throughout the project. Construction will be phased as discussed below.
Phase 1: June 2022 to Fall 2022
- Replacement of the existing storm sewers, catch basins, watermains and water services between Wharf Street and 50m east of Peter Street;
- Repairs (pipe lining) to the sanitary sewer from John Street to Dufour St;
- Full depth reconstruction of King Street, concrete curbs and concrete sidewalks between Wharf Street and 50m east of Peter Street;
- Reinstatement of private driveways & walkways disturbed due to construction activities or as required to achieve an acceptable slope, in materials matching existing (i.e., asphalt driveways will be reinstated with new asphalt);
- Reinstatement of grass disturbed due to construction activities with sod.
Phase 2: Spring 2023 to Fall 2023
- Replacement of the existing storm sewers, catch basins, watermains and water services between John Street and Wharf Street;
- Replacement of the existing storm sewers and catch basins at River Lane and Dufour St;
- Full depth reconstruction of King Street, concrete curbs and concrete sidewalks between John Street and Wharf Street;
- Asphalt milling and paving and replacement of sidewalk on Front Road West from 50m east of Peter Street to Dufour Street;
- Reinstatement of driveways disturbed due to construction activities or as required to achieve an acceptable slope, in materials matching existing (i.e., asphalt driveways will be reinstated with new asphalt);
- Reinstatement of grass disturbed due to construction activities with sod;
Pre-Construction Survey
Property owners directly adjacent to the work areas will be contacted shortly by Englobe to complete a pre-construction survey on your property at no cost. The purpose of the survey is to obtain video and photo records of the existing condition of buildings and other features near the construction zone. This information would then be available for reference in the unlikely event that damage is caused during construction.
Temporary Water Supply
A temporary potable water supply will be installed during the replacement of the watermain to service all affected properties. This will consist of an aboveground system connected to an outdoor hose bib at each property. A representative from Cornwall Gravel Co. Ltd. will review the house connection with the property owner prior to construction. Please contact the Contractor at their emergency number 613- 932-6571 should any issue arise with the temporary potable water supply.
A precautionary boil water advisory will be issued for properties connected to the temporary water supply in case of unplanned breaks in the temporary water supply.
Water Shutdowns
Daytime temporary water shutdowns will be required as part of the watermain replacement work and are expected to last less than four (4) hours. The Contractor will be responsible to coordinate with the impacted owners at least 24 hours in advance. Once the water is restored, please let your water run until it becomes clear.
Water shutdowns impacting the entire core of the village of L’Orignal will also be required as part of the watermain work. These shutdowns will be done overnight to minimize impacts to the residents and businesses and will be published on the Township’s website and social media in due course.
Traffic Control & Driveway Closures
Road closures will be required to allow for construction. Temporary traffic signs and/or detour signs will be posted as required. Likewise, driveways will need to be closed temporarily as the work progresses. The Contractor will be responsible to coordinate driveway closures with residents impacted by this work. During such time, we recommend parking your vehicles along the side streets.
Safety
We ask for your cooperation in ensuring a safe construction site. More specifically, please do not exceed posted speed limits and follow temporary traffic signage.
We apologize for this inconvenience and would like to thank you in advance for your patience.
Should you have any questions or concerns with the above, please communicate with Josh Gowsell, EVB Engineering’s Site Inspector and Project Manager at:
General Contractor
Jamie Leger
Cornwall Gravel Co. Ltd.
390 Eleventh St. W, Cornwall ON
Telephone & Emergency: 613-932-6571
Email: jamie@cornwallgravel.ca
Site Inspector & Project Manager
Josh Gowsell, C.E.T.
EVB Engineering
800 Second St W, Cornwall ON K6J 1H6
Telephone: 613-861-0153
Email: josh.gowsell@evbengineering.com
Contact Us