Municipal Charges and Fees by Department
Administration
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Bill Reprint or Statement (Tax, Water and Sewer) | $10 |
| Collection fee for all accounts receivable | Collection cost incurred by the Township |
| Photocopies – per copy | $0.50 |
| Refund processing fee | $10 |
| Registered mail | $20 |
| Returned cheques (NSF) (Waived in the event of death) | $35 |
| Tax certificate (not including work orders) | $65 |
| Tax certificate (combined with work order letter) | $130 |
| Tax Information Inquiry | $10 |
| Tax Notice/Reminder | $2 |
| Transfer between Accounts (Tax, Water and Sewer) | $10 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Extension agreement | Professional and legal costs incurred+ $200 |
| First notice of registration (Form 1) | Professional and legal costs incurred+ $100 |
| Tax arrear certificate | Professional and legal costs incurred + $500 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| For residents | $15 |
| For non-residents | $25 |
| Proof of Life | $10 |
| Burial permit | No charge |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| First and second false alarms | free |
| Third and additional false alarms within 12 months | $175 |
| Freedom of Information Requests (MFIPPA) | As per Regulation |
| Inspection fees – tile drainage | Inspection cost + 10% administration fee |
| Line Fences Act Administration Fee | $100 |
| Licence fees – lottery/raffle / bingo | 3% of total prize value |
| Integrity Commissioner Fees Refundable See By-Law 2019-10 section 8 | 100$ per complaint |
Building
| Description | Effective Jan. 1st, 2026 |
|---|---|
Residential dwelling unit, cottage or mobile home (per unit, up to 3 units) | $2,010+$0.71/ft2 |
| Include fin. basement and second floor | +$0.71/ft2 |
| Copy of any plan | Cost +$15.00 |
Residential apartment building (4 or more units) | $2,010 for the first unit +$1,275/unit + $0.71/ft2 |
| House addition, roofed porch, solarium, and basement replacement | $350+$0.71/ft2 |
| Residential garage, carport or utility shed | $200+$0.51/ft2 |
| Veranda, deck, balcony, or gazebo (roofed or not) | $85+$0.44/ft2 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| New | $2,550+$1.00/ft2 |
| Shell only (for separate permit) | $1,530 +$0.80/ft2
|
| Fit-up (for separate permit) | $1,530 +$0.55/ft2 |
| Additions | $1,025+$1.00/ft2 |
| Accessory buildings or a minor floor area increase | $515+$0.50/ft2 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| New | $560+$0.40/ft2 |
| Addition | $160+$0.40/ft2 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| New machinery shed, storage shed including tarp shelter on post or foundation, greenhouse | $560+$0.35/ft2 |
| Addition to a machinery shed, storage shed including tarp shelter on post or foundation, greenhouse | $160+$0.35/ft2 |
| Silos (horizontal or vertical) | $350 |
| Manure Lagoons | $450 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Above-ground pool 18” – 3’ | $35 |
| Inflatable pool | $35 |
| Above-ground pool higher than 3’ | $105 |
| Installation of a spa | $105 |
| Above-ground pool, spa and deck (100 sq. ft. or less) | $160 |
| Ground-level swimming pool | $310 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| As per calculation based on ft2 - residential | $85+$0.50/ft2 |
| As per calculation based on ft2 – Others, min. $250.00 | $160+$0.65/ft2 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Residential - houses | $205 |
| Residential – other (shed, house addition) | $105 |
| Commercial, Industrial, Institutional, Assembly | $360 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Residential | $255 |
| Commercial | $620 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Less than 200 ft2 | $105 |
| More than 200 ft2 | $130 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Residential | $255 |
| Commercial | $620 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Residential | $85 |
| Non-Residential | $285 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Inspection of newly installed water and sewer service By-law 2001-38 and 2001-39 | $200 each |
| Backflow prevention device permit By-law 2011-63 | $300 |
| Additional backflow prevention device permit | $70 |
| Backflow test report | $100 |
| Installation of backflow device prior to issuance of a permit | $600 |
| Plumbing fixtures | $15.30/fixture |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| New | $205 |
| Existing | $135 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| House | $255 |
| Other (residential only) | $125 |
| Commercial, industrial, institutional, assembly | $330 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Residential | $255 |
| Commercial | $560 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Residential | $245 |
| Commercial | $345 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Charged with building permit | $200 |
| Additional addressing blades (each) | $100 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Transfer permit | $240 |
Performance Deposits (Others include commercial, industrial, institutional and Assembly) | Residential $80 + $15.40/$1,000 or Others $260 + $15.40 per $1,000 |
| Change of Use | $305 |
| Dormant Permit | $155 |
| Revision to permit or drawings | $360 |
Minimum charge to be retained on a cancelled building permit refund to be established as per By-law 2024-59, sections 7.2 and 7.3 | % of the fee |
| Minimum charge to be retained on a cancelled building permit for permit fees of $400 or less | 25% of the permit fees |
| Additional or Re-Inspection Fees | $155 |
| After-Hour Inspection | $155 |
| Agency Letter of Approval Building | $155 |
By-Law Enforcement
| Description | Effective Jan. 1st, 2026 |
|---|---|
| MTO Search fee | $10 |
| Late payment fee | $25 |
| NSF fee | $25 |
| Hearing non-appearance fee | $100 |
| Plate denial request fee | $22 |
| Service by registered mail | $15 |
| Title search | $40 |
(HST to be added where applicable)
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Adoption fee | $0 |
| Daily impound fee | $45 |
| Disposal fee | cost of disposal + 10% administration fee |
| Dog kennel | $400 |
| Dog licence (per dog) | $25 |
| After March 1st (per dog) | $40 |
| Pickup fee – All Wards | $75 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Where the cost of construction, reconstruction, including labour and materials, is up to and includes $2,000 | $120 |
Where the cost of construction or reconstruction, including labour and materials exceeds $2,000 | $225 |
| Direction sign | $75 |
| Temporary sign | $75 |
| Sign modification or alteration | $75 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Residential zone | $70 |
| Non-residential zone | $170 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| First sale within a calendar year | $7 |
| Subsequent sale within a calendar year | $35 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Initial Licence | $50 |
| Licence renewal | $10 |
| Clean yard order enforcement By-law 2015-52 section 24, as amended | Under $5,000: Cost incurred + 15% Administration fee Over $5,000: Cost incurred + 10% Administration fee + $750 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Temporary encroachment | $85 + legal costs |
| Processing application/permanent | See the Planning fees |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| For one person - resident | $500 |
| For one person – non-resident | $975 |
| For each additional person - resident | $430 |
| For each additional person – non-resident | $850 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Taxicab – each | $310 |
| Taxicab – broker | $310 |
| Taxicab – company/owner/driver | $310 |
| Taxicab – each driver | $120 |
| Taxicab – Replacement fee for lost or destroyed licence | $25 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Per vehicle per year | $460 |
| Traps | $50 Deposit |
Fire Department
| Description | Effective Jan. 1st, 2026 |
|---|---|
| First and second false alarms within 12 months | free |
| Third and additional false alarm within 12 months | $800 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
Letters issued by the Fire Chief (File search, conformity, inspection report, etc.) The fee includes 2 hours of work. A fee of $75/hr will be added for any additional hour. | $133 |
| Multi-residential, commercial, industrial | $60/hr |
| Fire Watch – Required or requested | $150/hr |
| Air bottle refills | $50 per event plus 10$ per bottle |
| Equipment and Services not offered by Township By-law 2021-60 | Cost incurred by the Township |
| Smoke detector/alarm replacement to conform to Ontario Fire Code | Cost incurred by the Township |
| Vehicle fires – By-law 98-85 | No charge |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Permit – fire burning (7 days) | $20 |
| Permit – fire burning (30 days)September to May | $25 |
| Voluntary fire, with or without a permit | MTO rate per piece of equipment responded to the fire area. |
Parks and Recreation
| Description | Effective Aug. 1st, 2026 |
|---|---|
| Public regular prime time (Weekends and after 5 pm on weekdays) | $220 |
| Local Associations prime time (EPRMHA, Junior C Cougars, VKH Skating Club, VKH Rockets Broomball) | $139 |
| Other minor associations prime time ( E.O Cobras, E.O Wild, Ice Dogs, others as approved by the Director) | $205 |
| Public non-prime rentals (Monday-Friday before 5 pm) | $125 |
Local Associations non-prime time (EPRMHA, Junior C Cougars, VKH Skating Club, VKH Rockets Broomball) | $125 |
Other minor associations non prime-time (E.O Cobras, E.O Wild, Ice Dogs, others as approved by the Director) | $125 |
Last-minute ice rental (must verify availability with Recreation Coordinator) | $75 |
| Holidays (Township reserves the right to refuse request) | $265 |
| Secondary Schools | $98 |
| Elementary Schools | $78 |
| Tournament Minor | $150 |
| Tournament Adult | $220 |
| Party on ice (1 hour of ice, insurance and hall) | $156 |
| Skate Sharpening | $4 |
| Description | Effective Jan. 1st,2026 |
|---|---|
| Adult prime time (Weekends and after 5 pm on weekdays) | $74 |
| Adult Non-prime time (Monday-Friday before 5 pm) | $62 |
| Minor prime time (Weekends and after 5 pm on weekdays) | $63 |
| Minor non-prime time (Monday-Friday before 5 pm) | $52 |
| Trade shows (12 hours) | $800 |
| Description | Effective Jan. 1st,2026 |
|---|---|
| Drop-ins | $15 |
| Full-session membership | $85 |
| Description | Effective Jan. 1st,2026 |
|---|---|
Without electricity Individuals, Local Association, All Non-profit Groups, Schools | Free |
| Without electricity Private Businesses, For-Profit Groups | $30/hour |
With electricity (120V) Local Associations, Local Non-profit Groups, Schools | Free |
| With electricity (120V) Private Businesses, For-Profit Groups, Individuals | $35/hour |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Adult per game | $42 |
| Adult Tournament (full day) | $135 |
| Minor per game | $21 |
| Minor Tournament (full day) | $110 |
| Description | Effective Jan. 1st,2026 |
|---|---|
| Bar flat rate fee (5 hours) | $175 |
| Bar, more than 5 hours | flat rate + $20/h |
| Hall rental per hour (only for exercise classes and meetings of 20 people or less) | $39 |
| Hall rental per day | $230 |
| Hall and slab rental per week (5 days) | $1,200 |
| Funerals | $110 |
| Wedding | $330 |
| Holidays | $412 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Hall rental per hour (only for exercise classes and meetings of 20 people or less) | $25 |
| Hall rental per day | $137 |
| Holiday | $303 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Domestic Beer | $6.25 |
| Imported / Craft Beer | $6.75 |
| Coolers | $6.75 |
| Liquor | $6.25 |
| Wine per glass | $7.00 |
| Low alcohol beer (0.5%) | $4.75 |
| Water and soft drinks | $2.00 |
| Snacks | $2.00 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Deposit to reserve next season | $250 |
| Docking daily rate (minimum 25 ft.) | $2.50/ft |
| Docking weekly rate (minimum 25 ft.) | $12.50/ft |
| Seasonal with electricity (minimum 25 ft.) | $64/ft |
| Seasonal with electricity and water (minimum 25 ft.) | $65/ft |
| Seasonal no electricity (minimum 25 ft.) | $62/ft |
| Launching - daily rate | $13.28 |
| Launching – daily rate resident | Free |
| Pump out | $35 |
| Lost Key | Cost + 10% Admin. Fee |
| Fuel | Market Rate |
| Concession snacks (Chips, chocolate, candy) | $2.50-$4.75 |
| Drinks (Bottled and canned) | $2.50-$4.75 |
| Ice cream and frozen snacks | $3.00-$5.00 |
| Convenience items (Ice, oil, sunscreen, etc.) | $4.50-$22.00 |
Planning
Note: Applicant to pay legal costs for all agreements /by-laws that are to be registered on title.
Any and all fees incurred by the municipality for the review and approval of the studies and analysis supporting the revision of a development application shall be assumed by the applicant.
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Consultation Fee on Development Application | $0 + Engineering & Technical Review Costs |
| Amendment to the United Counties of Prescott and Russell Official Plan (Municipal Review Fee) | $510 |
| Amendment to the Champlain Township Official Plan | $4,850 |
| Re-Notification of Public Meeting or Open House at the Request of the Applicant/Proponent | $800 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Consultation Fee on Development Application | Free + Engineering & Technical Review Costs |
Zoning By-law Amendment Champlain Township Zoning By-law | $3,850 + Engineering & Technical Review Costs |
| Combined Local Official Plan Amendment and Zoning By-law Amendment | $4,500 + Engineering & Technical Review Costs |
| Zoning By-law Amendment as a Condition of Consent Application | $3,300 + Engineering & Technical Review Costs |
| Temporary (T) Zoning By-law Amendment | $2,700 + Engineering & Technical Review Costs |
| Removal of Holding Provision (H) Zoning By-law Amendment | $900 + Engineering & Technical Review Costs |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Consent Review (Municipal Review Fee) | $600 |
| Consent Agreement | $375 + Legal costs |
| Renewal or Extension of Consent Decision following a lapse of Approval. | $125 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Minor Variance | $1,600 |
| Part Lot Control By-law / Deeming By-law | $400 + Legal costs |
| Easement / Encroachment By-law | $400 + Legal costs |
| Easement By-law Amendment | $400 + Legal costs |
| Easement By-law as a Condition of Minor Variance, Consent or Site Plan Approval | $400 + Legal costs |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Consultation Fee on Development Application | $0 + Legal + Engineering & Technical Review Costs |
| Site Plan Agreement (Excluded from MG or MR Zone) | $2,600 + Legal, Engineering & Technical Review Costs |
| Site Plan Agreement within Industrial Heavy Zone (MG) or Industrial Rural Zone (MR) | $5,100 + Legal, Engineering & Technical Review Costs |
| Amendment Site Plan Agreement | $510 + Legal, Engineering & Technical Review Costs |
| Amendment to Registered Site Plan Agreement (Addition, Increase to Parking and Loading Areas) | $760 + Legal, Engineering & Technical Review Costs |
| Request for Release of Financial Securities Per request (final request is free) | $100 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Consultation Fee on Development Application (Subdivisions & Plan of Condominium) | $0 + Engineering & Technical Review Costs |
Draft Plan of Subdivision (Municipal Review Fee) | $1,020 + Engineering & Technical Review Costs |
| Revision to Draft Plan of Subdivision Following Decision by Approval Authority | $510 + Engineering & Technical Review Costs |
| Re-Submission of Draft Plan of Subdivision Following Decision by Approval Authority | $510 + Engineering & Technical Review Cost |
| Re-Submission of Draft Plan of Subdivision Following Lapse of Approval | $510 + Engineering & Technical Review Cost |
| Revision to M-PLAN that is not deemed to be a plan of subdivision | $1,020 + Engineering & Technical Review Cost |
| Pre-Servicing Agreement Application | $1,020 + Legal, Engineering & Technical Review Cost |
| Cost Sharing Agreement Application | $1,020 + Legal, Engineering & Technical Review Cost |
| Subdivision Agreement Application | $4,100 + Legal, Engineering & Technical Review Cost |
Subdivision Approval Fee To be paid before a pre-servicing, front-ending, cost-sharing or subdivision agreement. | $150.00 / Dwelling Unit or Block or min. $3,500 |
| Amendment to Subdivision Agreement | $1,510 + Legal, Engineering & Technical Review Cost |
| Lifting Foot Reserve | $105 + Legal costs |
| Appraisal Services – Parkland Dedication | Actual Cost of Appraisal Services |
| Red Line Revision Comments to the UCPR or LPAT | $410 |
| Release of Inhibiting Orders | $105 + Legal costs |
| Plan of Condominium | $150.00 / Dwelling Unit or Block or min. $3,500 |
| Exemption to a Plan of Condominium | $500 |
| Condominium Conversion | $500 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Zoning Confirmation Letter | $105 |
| Compliance Certificate | $105 |
| Sale of Official Plan (Paper Copy) | $25 |
| Sale of Zoning By-law (Paper Copy) | $75 |
| Sale of Schedules (11”x17”) | $7 |
| LPAT Appeal Deposit – Where Council’s Decision is Appealed by a Third Party | $4,000 per day |
| Sale of Unopened Road Allowance | Applicant to pay costs as per the applicable By-law. |
| Application Fee Refunds | 100 % if the request is made before the application is placed on technical circulation 30% if the request is made after the technical circulation Nil if the request is made after the public meeting |
Public Works
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Road cut permit | $200 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Ditch cut, including drilling under a road from a ditch | $1,500 |
| Gravel road cut | $1,500 |
| Asphalt road cut for not over 50% of the roadway width | $1,500 |
| Asphalt roadway cut for full roadway width | $2,500 |
| Concrete or asphalt sidewalk or concrete surface | $2,000 |
| Concrete curb or gutter | $1,500 |
| Interlocks pavers | $750 |
| Landscape area | $750 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Entranceway permit | $200 |
| Security deposit | $1,500 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Roadside ditch alteration permit | $200 |
| Security deposit | $1,500 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Tandem Truck | $115/hr |
| Backhoe | $145/hr |
| Shovel | $198/hr |
| Razor | $153/hr |
| Loader | $145/hr |
| Water Truck | $106/hr |
| Float (Per move) | $245 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Annual garbage collection fee per unit | $225 |
| Bag Tag amended By-law 2013-04 | $3 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| All loads (excluding contractors), regardless of size/type. The vehicle/trailer will be measured and charged a rate per cubic foot | $0.65 |
| Tire, without rim (maximum 4 per person) Must be able to leave name and address from who and where the tires came from | free |
| Tire, without rim (in excess of the maximum of 4 per person) | $10/tire |
| Tire, with rim | $25/tire |
| Additional charge – items with coolant or refrigerant – air conditioner, refrigerator (refrigerant must be removed and tagged by licensed contractor prior to acceptance) | $10/item |
| Triaxle (maximum 24 cubic yards) | $ 350 |
| Tandem (maximum 18 cubic yards) | $260 |
| Single axle (maximum 10 cubic yards) | $150 |
| Quantities in excess of the maximum | $15/cubic yard |
| Landfill opening fee for contractor (Free only on Tuesday from 8:00 to 16:00 with 24 hours notice) | N/A |
| Mattress Recycling | $20 |
Water & Sewer
| Description | Effective Jan. 1st, 2026 |
|---|---|
| 16 mm X 19 mm (5/8” X 3/4”) meter | $987 |
| 25 mm (1”) meter | $1,275 |
| 38 mm (1 1/2”) meter | $1,878 |
| 50 mm (2”) meter | $2,398 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| 16 mm X 19 mm (5/8” X 3/4)” meter | $425 |
| 25 mm (1”) meter | $525 |
| 38 mm (1 1/2”) meter | $575 |
| 50 mm (2”) meter | $725 |
Any other size of meter pit fee to be determined – cost based on the actual cost of equipment and materials, plus plumbing fee and a 10% administration fee
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Fee for meter testing: A deposit will be reimbursed if the meter is found to be defective. | $400 |
| Water and sewer certificate reading | $65 |
| Late penalty/interest on overdue accounts | 1.25%/month |
| Notice of disconnection | $85.00 |
| Reconnection charge | $85.00 |
| Taking water from a fire hydrant | $3.20/cu. metre |
| New connection until the meter is installed | Minimum consumption per billing period |
| Storm water discharge to sanitary sewer connection charge – annual per connection | $100 |
| Dumping at L’Orignal wastewater treatment plant | $7.85 / cu. metre |
| Private haulers (contractors) dumping at L’Orignal Wastewater Treatment Plant – annual administrative fee | $500 |
| High Strength Sewage Service Rate – By-law 2007-28 | As per Council resolution |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Water | $1,800 |
| Sewer | $4,800 |
| Total | $6,600 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Water | $2,400 |
| Sewer | $6,400 |
| Total | $8,800 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Water | $3,000 |
| Sewer | $7,985 |
| Total | $10,985 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Water | $3,600 |
| Sewer | $9,590 |
| Total | $13,190 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Water | $4,800 |
| Sewer | $12,785 |
| Total | $17,585 |
| Description | Effective Jan. 1st, 2026 |
|---|---|
| Sewage service only (flat rate) | $168.95 |
| Service | Minimum meter consumption | Rate per cubic meter/factor | Minimum amount |
|---|---|---|---|
| Water | 42m3 | $2.982 | $125.24 |
| Sewer | n/a | $1.31 | $164.06 |
| Total | $289.30 |
| Service | Minimum meter consumption | Rate per cubic meter/factor | Minimum amount |
|---|---|---|---|
| Water | 63m3 | $2.982 | $187.87 |
| Sewer | n/a | $1.31 | $246.11 |
| Total | $433.98 |
| Service | Minimum meter consumption | Rate per cubic meter/factor | Minimum amount |
|---|---|---|---|
| Water | 84m3 | $2.982 | $250.49 |
| Sewer | n/a | $1.31 | $328.14 |
| Total | $578.63 |
| Service | Minimum meter consumption | Rate per cubic meter/factor | Minimum amount |
|---|---|---|---|
| Water | 126m3 | $2.982 | $375.73 |
| Sewer | n/a | $1.31 | $492.21 |
| Total | $867.94 |
| Service | Minimum meter consumption | Rate per cubic meter/factor | Minimum amount |
|---|---|---|---|
| Pleasant Corners' School - Water | 855m3 | $2.982 | $2,549.61 |
| St-Jude's Catholic School - Water | 427.5m3 | $2.982 | $1,274.81 |
| All connection- Water | In excess of the minimum consumption | $2.982 | In excess of the minimum consumption |
| All connection - Sewer | In excess of the minimum consumption | $1.31 | In excess of the minimum consumption |